As we believe in raising our benchmarks of quality, we maintain stringent quality standards in our processes of manufacturing our products. We ensure that the products go through rigorous quality checks at every stage of production right from the sourcing of raw materials to the final testing. We ensure that the product is of excellent quality. Remaining true to our beliefs, we strive for continuous improvements in the way we work and deliver products to our customers with whom we wish to maintain a lasting business partnership.
Tests Process | Visual D C A |
Dimensional D C A |
Chemical D C A |
Physical Destruct D C A |
Physical ( N D T ) D C A |
Metallurgical D C A |
|
Incoming Inspection Log Book Records |
100% II-RM II-RM II-RM Raw Materials |
Sampling II-QC II-QC I-QC Chemical Laboratory |
|||||
Melting & Casting Log Book Records |
100% II-MC II-MC I-H.P. Melting/Casting |
100% Ill-QC II-QC I-QC Chemical Laboratory |
Sampling II-QC II-QC I-QC Chemical Laboratory |
||||
Billet Cutting Log Book Records |
100% II-MC II-MC I-H.P. Billet Cutting |
||||||
Extrusion Log Book Records |
100% IE.P. III-E.P. II-E.P. N.A. |
Sampling III-E.P. II-E.P. I-H.P. Extrusion Press |
Sampling II-QC II-QC I-QC Chemical Laboratory |
||||
Shell Inspection Log Book Records |
100% II-QC II-QC I-QC Shell Inspection |
100% III-QC II-QC I-QC Shell Inspection |
|||||
Pickling Log Book Records |
100% IV-CP I-CP I-CP N.A. |
||||||
Intermediate Annealing Log Book Records |
100% IV-CP I-CP I-CP Annealing |
Sampling Physical Laboratory |
|||||
Tube Drawing Log Book Records |
Sampling IV-CP III-CP I-CP Drawbenches |
Sampling III-CP I CP I-CP Drawbenches |
|||||
Tube Straightening Log Book Records |
100% IV-CP III-CP I-CP Straightening |
||||||
Final Annealing Log Book Records |
100% IV-CP III-CP I-CP Annealing |
Sampling III-QC II-QC I-QC Drawbenches |
|||||
Final Inspection Log Book Records |
100% II-RM II-RM II-RM Inspection |
100% III-QC II-QC I-QC Inspection |
Sampling III-QC II-QC I-QC Chemical Laboratory |
Sampling III-QC II-QC I-QC Physical Laboratory |
100% III-QC II-QC I-QC Physical Laboratory |
Sampling III-QC II-QC I-QC Chemical Laboratory |
|
Legend and Notes | MC.Melting/Casting | I-Manager | Destructive | Hardness, Tensile, Drifiting, Flattening, Double Bend & Mercurous Nitrate Tests. | |||
D-Done by | NA-Not Applicable | HP-Hot Production | II-Engineer/Office | Physical Tests: | |||
C-Checked by | RM-Raw Materials | EP-Extrusion Press | Ill-Supervisor | Non Districtive | Hydraulic Pressure Test Air Pressure Test & Eddy Current Test. | ||
A-Approved by | QC.Quality Control | CP-Cold Processing | IV-Workman | Physical Tests: |
By clicking on 'I agree' you give permission for their placement and the processing of personal data obtained in this way, as stated in our privacy & cookie statement.